Permskaya TPS

Challenge:

  • Transportation of 3 blocks of steam and gas turbine equipment Siemens from Rotterdam (Holland) to Dobryanka (Perm region, Russia)
  • 18 000 m3 of total volume, the heaviest item is 320 t

Solution:

  • Chartering of river-sea vessel from Rotterdam (Holland) to Nizhnekamsk (Republic of Tatarstan, Russia)
  • River transportation from Nizhnekamsk to Dobryanka (Perm region, Russia)
  • Construction of temporary ro-ro berth in Dobryanka and cargo unloading by ro-ro way
  • Road transportation to the site of Permskaya thermal power station